Objectives
In consultation with the STOWA supervision committee for MBR projects, the
Rhine and IJssel Water Board and DHV drew up a research programme containing
the following objectives:
- demonstrating the technical feasibility of scaling up the MBR technology;
- demonstrating the stability of the operational management;
- determining the technical results, subdivided into pre-treatment, biological
operation and membranes;
- investigating the need for redundancy;
- optimising process management;
- evaluating the design (based on items 1 to 5 inclusive);
- comparing the costs of the MBR plant with the costs of a conventional
plant.